摘要 为了解决司马矿井下断层带地质条件复杂、易透水、易垮落的不足,利用TSP物探技术实现了对井下断层带地质情况的快速勘探,利用超前预注浆加固、锚网索联合支护的方案,确保了巷道过断层支护的稳定性和可靠性。根据实际应用表明,新的过断层支护技术将两帮的变形量降低了69.4%,顶板变形量降低了76.7%。 In order to solve the deficiency of complex geological conditions,easy water permeability and easy collapse of the underground fault zone in Sima Mine,the TSP geophysical prospecting technology is used to realize the rapid exploration of the geological conditions of the underground fault zone,and the scheme of advance pre-grouting reinforcement and anchor mesh cable combined support is used to ensure the stability and reliability of roadway fault support.According to the practical application,the new fault support technology reduces the deformation of the two sides by 69.4%,and the roof deformation by 76.7%.
作者 马磊 Ma Lei(Lu'an Chemical Group Sima Coal Industry Co.,Ltd.,Shanxi Changzhi 047199)
出处 《山东煤炭科技》 2022年第6期50-52,共3页 Shandong Coal Science and Technology
关键词 过断层 超前 物探 支护 cross the fault in advance geophysical exploration support
  • 相关文献

参考文献5

二级参考文献32

共引文献99

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部