为实现1390轨道石门17+18号煤层揭煤段瓦斯抽采达标和煤层消突,采用低位钻场穿层预抽技术,在低位钻场和石门工作面同步施工穿层钻孔预抽煤体瓦斯,提高施工效率和预抽效果,使17+18号煤层短期抽采达标,缩短了揭煤工期,实现了突出厚煤层的安全快速揭煤。
In order to achieve the gas extraction standard and coal seam outburst elimination in the uncovering section of the 1390 track Shimen No.17+18 coal seam,the low drilling site cross layer pre-drainage technology is adopted to drill the coal body gas through the low drilling field and Shimen working face synchronously,so as to improve the construction efficiency and pre-drainage effect,make the short-term extraction of No.17+18 coal seam reach the standard,shorten the coal exposure period,and realize the safe and rapid coal uncovering of the outburst thick coal seam.
作者
李臣武
Li Chenwu(School of Architectural Engineering,Guizhou Vocational and Technical College,Guizhou Guiyang 550023)
出处
《山东煤炭科技》
2022年第6期112-115,共4页
Shandong Coal Science and Technology
关键词
突出煤层
石门揭煤
低位钻场
穿层预抽
outburst coal seam
uncover coal in Shimen
low drilling field
cross layer pre-pumping