采乃风电场建设管理综述

On the Construction Management of Cainai Wind Farm
下载PDF
导出
摘要 普格采乃风电场建设中,通过利用大数据分析风能资源,引入全过程项目管理的理念和方法,开展设计优化,调整施工组织管理,优化施工工序,重视技术引领,利用视频监控系统进行安全管控科学有效的管理措施,实现了无伤亡、无环保事故,造价7000元/kW以下,确保了施工总工期10个月,工程建设总体优良目标。 In the construction of Cainai Wind Farm in Puge County,Sichuan Province,the whole process management concept and measures are adopted.The wind energy resources are firstly analyzed with big data technology.Then,by carrying out the design optimization,adjusting the construction organization and management,optimizing the construction procedures,emphasizing the technology guidance,adopting the video monitoring system for safety control and other scientific and effective management measures,we have achieved an overall excellent construction of the project with no causalities,no environmental accidents,controlled construction cost of less than 7000 yuan/kW,and the total construction period of 10 months.
作者 朱利明 ZHU Liming(Datang Sichuan Power Generation Co., Ltd., Chengdu 610000, China)
出处 《水电与新能源》 2022年第7期1-4,共4页 Hydropower and New Energy
关键词 山地风电场 全过程管理 管理措施 高质量开发 mountainous wind farm whole process management management measures high-quality development
  • 相关文献

参考文献5

二级参考文献11

共引文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部