摘要
随着风电项目的快速推进,如何确保项目建设“短、平、快”、安全和按期投产,招标采购与供应商管理是关键的一环。因此,电力企业要从招标采购与供应商整治入手,建立完整的招标采购与供应商管理机制,重点解决外包外委队伍资质不符合要求、借用资质、违法转包分包、以包代管、设备及备件质量等问题,为提升企业安全水平奠定基础。
With the rapid development of wind power projects,the bidding procurement and supplier management is a key procedure to ensure the short,smooth,fast,safe and timely construction and operation of the projects.Thus,electric power enterprises should establish a complete bidding procurement and supplier management mechanism,focusing on solving the existing problems of unqualified outsourcing teams,borrowed qualification,illegal subcontracting,management replaced by subcontracting,and the quality issues of equipment and spare parts,to provide a solid foundation for the improvement of the safety level.
作者
秦立林
QIN Lilin(Datang Sichuan Power Generation Co., Ltd., Chengdu 610091, China)
出处
《水电与新能源》
2022年第7期9-11,63,共4页
Hydropower and New Energy
关键词
采购
供应商
整治
对策
procurement
supplier
treatment
countermeasure