基于采乃风电项目建设物资保障策略研究

Construction Material Support Strategy in Cainai Wind Power Project
下载PDF
导出
摘要 通过对采乃山地风电建设设备物资保障工作中的主要问题与困难进行分析,从设置设备催交组织机构,针对性开展催交工作的原则,具体设备的催交策略,大件设备运输策略等方面探索了山地风电建设中物资保障工作方式、方法,使项目物资保障措施有效实施,促成项目“年内开工、年内全容量投产目标”,创造了高海拔风电建设史上的“大唐速度”。 This paper analyzes the major problems and difficulties in the equipment and material support work in the construction of Cainai Wind Power Project.The construction material support work in mountainous wind power projects is explored from various aspects such as the establishment of equipment expediting organization,the principle of carrying out targeted expediting work,the expediting strategy of specific equipment,and the transportation strategy of large equipment.With the effective implementation of the material support measures,the construction goal of the project that starting construction and production in full capacity within the year is achieved,which creates a specific“Datang speed”in the history of high altitude wind power development.
作者 李信良 LI Xinliang(Datang Guangyuan Wind Power Development Co., Ltd., Chengdu 610074, China)
出处 《水电与新能源》 2022年第7期22-26,共5页 Hydropower and New Energy
关键词 山地风电项目 采乃风电项目 物资保障 设备催交 mountainous wind power project Puge Cainai Wind Power Project material support equipment expediting
  • 相关文献

参考文献6

二级参考文献11

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部