水电站减水河段河道生态流量计算 被引量:6

Study on calculation of ecological flow in water reducing reach of hydropower station
下载PDF
导出
摘要 为了合理确定水电站减水河段河道生态流量,提出了分时段分方法计算河道生态流量的思路。以西藏扎拉水电站为例,对减水河段的河道生态流量进行了计算。在鱼类生长繁殖期(4~9月)可采用生境模拟法;在非产卵繁殖期(10月至次年3月)可采用水文学法、水力学法及生态水力学法综合分析计算。结果表明:在鱼类生长繁殖旺盛期(5~8月)所需生态流量为33.0 m^(3)/s,一般繁殖期(4月及9月)为22.0 m^(3)/s,非产卵期(10月至次年3月)为15.9 m^(3)/s。研究结果可为水电站减水河段生态流量的确定提供借鉴。 In order to determine the ecological flow in water reducing reach of hydropower station reasonably,the idea of calculating the river ecological flow by time-slot and situation-based method was put forward.The Zhala Hydropower Station was taken as example to calculate the ecological flow in water reducing reach.The habitat simulation method was used in the fish growth and breeding period(April to September);in the non breeding period(October to March),the comprehensive analysis and calculation of hydrology method,hydraulic method and ecological hydraulic method were used.The results showed that the ecological flows needed in the period of vigorous growth and reproduction(May to August)were 33.0 m^(3)/s,and 22.0 m^(3)/s in the general breeding period(April and September);the ecological flow in non breeding period(October to March)was 15.9 m^(3)/s.This research results can provide reference for the determination of ecological flow in water reducing reach of hydropower station.
作者 马俊超 王琨 张仲伟 MA Junchao;WANG Kun;ZHANG Zhongwei(Changjiang Survey,Planning,Design and Research Co.,Ltd.,Wuhan 430010,China;Bureau of Hydrology,Changjiang River Water Resources Commission,Wuhan 430010,China;不详)
出处 《水利水电快报》 2022年第7期15-19,共5页 Express Water Resources & Hydropower Information
关键词 生态流量 鱼类生境 减水河段 玉曲河 扎拉水电站 ecological flow fish habitat water reducing reach Yuqu River Zhala Hydropower Station
  • 相关文献

参考文献13

二级参考文献173

共引文献321

同被引文献75

引证文献6

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部