中美规范中土石坝坝顶高程计算差异性研究

Difference research on embankment dam crest elevation between Chinese and American specifications
下载PDF
导出
摘要 为使参与涉外工程建设的中国水电企业工程人员了解和掌握国内外水电工程规范的差异,在分析中国和美国现行土石坝水电规范条文的基础上,运用工程算例计算了土石坝坝顶高程。分析结果表明,中国规范确定的土石坝坝顶高程大于美国规范的计算值,可满足美国规范要求。研究成果可为类似国外土石坝工程建设提供参考。 For Chinese hydropower entrepreneur engineers involved in international projects to acknowledge and acquire the hydropower specification difference between Chinese and foreign countries,based upon analyzing Chinese and USA hydropower specifications,the embankment dam crest elevation is obtained by one project calculation.The results demonstrate that the embankment dam crest calculated by Chinese specification is higher than the one calculated by USA and meet USA demands. These achievements may be taken as a reference for similar foreign projects.
作者 岳朝俊 杨卫甲 吴超 张超 YUE Chaojun;YANG Weijia;WU Chao;ZHANG Chao(Changjiang Survey,Planning,Design and Research Co.,Ltd.,Wuhan 430010,China;Dali Bai Autonomous Prefecture Institute of Hydraulic Survey,Design and Research,Dali 671000,China)
出处 《水利水电快报》 2022年第7期95-100,共6页 Express Water Resources & Hydropower Information
基金 长江设计集团有限公司自主创新项目(CX2019Z48)。
关键词 土石坝 坝顶高程 中美规范 embankment dam dam crest elevation specifications of Chinese and USA