摘要
针对长流程钢铁企业的污水特点,简要叙述了钢铁企业的节水方式和主要污水处理工序以及废水零排放的实现路径。分析了目前实现废水零排放所面临的问题,并提出了进一步巩固改进废水零排放的建议。
According to the sewage characteristics of long-process iron and steel enterprises,the water-saving methods and main sewage treatment procedures of iron and steel enterprises and the realization path of zero discharge of wastewater are briefly described.The problems faced by the current realization of zero discharge of wastewater are analyzed,and the suggestions for further consolidation and improvement of zero discharge of wastewater are put forward.
作者
王睿琦
杜宪伟
WANG Ruiqi;DU Xianwei(Shandong Iron and Steel Group Rizhao Co.,Ltd.,Rizhao 276800,China)
出处
《山东冶金》
CAS
2022年第3期61-65,共5页
Shandong Metallurgy
关键词
长流程
钢铁企业
节水
污水处理工序
废水零排放
long process
steel industry
water saving
Sewage treatment process
Zero discharge of wastewater