论“三控三管一协调”在天然气输气管线建设中的应用

On the application of“three controls,three pipes and one coordination”in the construction of natural gas transmission pipeline
下载PDF
导出
摘要 随着西气东输一线、二线等一大批长距离天然气管道建设于投产,国内各区域天然气管道也陆续开工建设,中国迎来了天然气管道建设的一次飞速发展,因此在天然气输气管道建设中的项目管理中也变得尤为重要。项目管理是以施工项目为管理对象,以项目经理责任制为中心,以合同为依据,按施工项目的内在规律,实现资源的优化配置和对个生产要素进行有效地计划、组织、指导、控制,取得最佳的经济效益的过程。 With the construction and operation of a large number of long-distance natural gas pipelines such as the first and second lines of West to east gas transmission,and the construction of natural gas pipelines in various regions in China,China has ushered in a rapid development of natural gas pipeline construction.Therefore,it has become particularly important in the project management of natural gas pipeline construction.Project management is a process that takes the construction project as the management object,takes the project manager responsibility system as the center,takes the contract as the basis,and according to the internal law of the construction project,realizes the optimal allocation of resources and effectively plans,organizes,guides and controls each production factor,so as to obtain the best economic benefits.
作者 吕钊 Lu Zhao(Shanxi Huaxin Transportation Energy Group Co.,Ltd.,Taiyuan 030000)
出处 《石化技术》 CAS 2022年第6期63-65,共3页 Petrochemical Industry Technology
关键词 天然气 输气管道 项目管理 Natural gas transmission pipeline project management
  • 相关文献

参考文献2

二级参考文献2

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部