摘要 山西阳光发电有限责任公司#4机组DCS系统改造项目采用上海新华控制技术(集团)有限公司的XDC-800分散控制系统。为保证机组安全、经济运行,提高自动投入率,增强控制抗干扰能力,对协调控制系统策略进行了优化。文章通过分析该机组DCS改造过程中AGC功能设计、组态和优化调试,详细介绍了DCS系统改造后的机组协调控制策略,为同类型机组的优化提供了经验。 The DCS system transformation project of#4 unit of Shanxi Sunshine Power Generation Co.,LTD.,adopts the XDC-800 decentralized control system of Shanghai Xinhua Control Technology(Group)Co.,LTD.In order to ensure the safe and economic operation of the unit,improve the automatic input rate,and enhance the control and anti-interference ability,the coordination control system strategy is optimized.By analyzing the AGC function design,configuration and optimization debugging in the DCS transformation process of Sunshine#4 unit,this paper introduces the unit coordination control strategy of DCS system transformation in detail,which provides experience for the optimization of the same type of unit.
作者 王宁 Wang Ning
出处 《电力系统装备》 2022年第6期8-10,共3页 Electric Power System Equipment
关键词 AGC 一次调频试验 协调控制 控制策略 AGC one FM test coordinated control control strategy
  • 相关文献

参考文献2

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部