期刊文献+

秦山核电厂主控制室更新技术研究与策划

Main Control Room Renewal Technology Research&Planning of Qinshan Nuclear Power Plant
原文传递
导出
摘要 基于运行许可延续(OLE)的需求,为确保主控制室与应急控制室(简称主控室和应控室)的设计及设备符合国家核安全相关法规及标准要求,通过对秦山核电厂主控室及应控室的盘台现状、人机接口进行调查和分析,对盘台结构、设备改进及人机接口再设计进行了研究,提出了主控室和应控室整体更新的解决思路并开展了可行性论证,策划了总体设计更新方案、验证流程和实施管控方法。工程实践及运行业绩表明本研究方法是有效的,可为核电机组OLE研究提供指导。 Based on the requirements of Operation License Extension(OLE)and ensuring that the design and equipment of the main control room and emergency control room(referred to as the main control room and the emergency control room)comply with the relevant national nuclear safety regulations and standards,based on the investigation and analysis of the status quo of panels and consoles and man-machine interfaces of the main control room and the emergency control room in Qinshan Nuclear Power Plant,the structures of the panels and consoles,the improvement of equipment and the redesign of the man-machine interface are studied.The solution of the overall renewal of the main control room and the emergency control room is put forward and the feasibility demonstration is carried out.Methods for updating the overall design scheme,validating the process and implementing the controls are planned.The engineering practice and operation performance show that this research method is effective and can provide guidance for OLE research of nuclear power units.
作者 蒲晓彬 马骏 周建华 陈子明 陆佩芳 谢睿 Pu Xiaobin;Ma Jun;Zhou Jianhua;Chen Ziming;Lu Peifang;Xie Rui(CNNC Nuclear Power Operation Management Co.,Ltd.,Haiyan,Zhejiang,314300,China;Shanghai Nuclear Engineering Reseach&Design Institute Co.,Ltd.,Shanghai,200233,China)
出处 《核动力工程》 EI CAS CSCD 北大核心 2022年第S01期44-50,共7页 Nuclear Power Engineering
关键词 主控制室 应急控制室 核电厂 更新 Main control room Emergency control room Nuclear power plant Renewal
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部