期刊文献+

煤矿瓦斯抽采系统改造技术探讨

Discussion on transformation technology for methane drainage system in coal mine
下载PDF
导出
摘要 以峰峰集团大淑村煤矿为例,对该矿高、低负压抽采系统进行优化改造的升级工作。通过采取增设新管道井、更换大管径抽采管路及并网提压等措施,有效减小矿井抽采管网阻力,提高井下瓦斯抽采管路负压,优化管网布置,大幅度提升了矿井的抽采能力。 Former methane high and low pressure drainage system in Dashu Cun Colliery is transformed and optimized.By installing new pipe wells,replacing large diameter drainage pipelineand pipeline pressurization,etc.,the drainage resistance of the mine has been reduced effectively,negative pressure of drainage pipeline has been increased and drainage pipeline has been reasonably arranged,the capacity of the extraction system has been greatly improved.
作者 付京 FU Jing(Jizhong Energy Fengfeng Group Corporation Ltd.,Handan,056107,China)
出处 《华北科技学院学报》 2022年第4期78-82,共5页 Journal of North China Institute of Science and Technology
关键词 瓦斯抽采 管道井 抽采阻力 负压 methane drainage pipeline shaft drainage resistance negative pressure
  • 相关文献

参考文献8

二级参考文献82

共引文献271

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部