摘要
为解决新乡市获嘉县沿黄地区资源性缺水状况及水资源分布不均等供需矛盾,规划在新乡市获嘉县建设调蓄工程。根据受水灌区的位置、引水水源及地形地质情况,经分析研究,最终推荐选用垂直防渗多头小直径深层水泥搅拌防渗墙方案。
in order to solve the resource-based water shortage,uneven distribution of water resources and the contradiction between supply and demand in a certain area along the Yellow River,it is planned to build a regulation and storage project in a certain area.According to the location of water receiving irrigation area,water diversion source and topographic and geological conditions,through analysis and research,the scheme of vertical anti-seepage multi head small-diameter deep cement mixing anti-seepage wall is finally recommended.
作者
李振虎
LI Zhenhu(Henan Third Institute of Resources and Environment Investigation,Zhengzhou 450000,China)
出处
《水科学与工程技术》
2022年第3期69-73,共5页
Water Sciences and Engineering Technology
基金
新乡市黄河沿岸地区生态保护修复项目(新自资规[2020]222号)。
关键词
引黄调蓄工程
调蓄池
防渗墙
Yellow River Diversion regulation and storage project
regulation and storage tank
anti-seepage wall