期刊文献+

“多功能小型文化服务综合体构建技术研发与应用示范”项目的实施与重点环节管理 被引量:1

Implementation and Key Link Management of the Project of Construction Technology Research and Application Demonstration of the Multi-Functional Small-Scale Cultural Service Complex
下载PDF
导出
摘要 阐述国家重点研发计划“多功能小型文化服务综合体构建技术研发与应用示范”项目实施的组织和协调过程,详细论述项目实施的技术路线和各研究任务之间的接口问题。通过分析创新成果、不确定性与风险、示范点构建及运营等项目实施过程中关键环节的组织管理,探索总结示范型国家重点研发计划项目的管理方法和经验,运用“持续改进”思想不断提升科研项目管理的成熟度,逐步增强单位的科研管理能力。 This paper expounds the organization and coordination process of the implementation on the National Key R&D Program of China"construction technology research and application demonstration of the multi-functional small-scale cultural service complex",and discusses in detail the technical route of project implementation and the interface between various research tasks.By analyzing the organization and management of key links in the project implementation such as innovation achievements,uncertainty and risk,demonstration site construction and operation,explore and summarize the management methods and experience during the project implementation of the National Key R&D Program of China.By using the idea of"continuous improvement",continuously improve The management maturity of scientific research project and gradually enhance the scientific research management ability of the company.
作者 丰其云 刘榛 吴立锋 倪洪杰 FENG Qiyun;LIU Zhen;WU Lifeng;NI Hongjie(Zhejiang Dafeng Industrial Co.,Ltd.,Yuyao Zhejiang 315400,China;College of Information Engineering,Zhejiang University of Technology,Hangzhou Zhejiang 310014,China.)
出处 《演艺科技》 2022年第2期88-94,共7页 Entertainment Technology
基金 国家重点研发计划课题“多功能小型文化服务综合体的集成构建与运营示范”(编号:2018YFB1403704)的资助。
关键词 多功能小型文化服务综合体 项目实施 技术路线 任务接口 科研项目管理 管理成熟度 multi-functional small-scale cultural service complex project implementation technical route task interface scientific research project management management maturity
  • 相关文献

参考文献4

二级参考文献24

  • 1郭新艳,郭耀煌.基于TOPSIS法的地区科技竞争力的综合评价[J].软科学,2004,18(4):30-32. 被引量:33
  • 2熊竹.我国科研院所项目管理成熟度模型[J].科学学与科学技术管理,2005,26(6):19-21. 被引量:8
  • 3Paulk, M., Curtis. B., Chrissis, M. and Weber.C. Capability maturity model for Software, Version 1.1 [M]. SEI, Carnegie Mellon University, Pittsburgh, USA,1993.
  • 4Kwak. Y. H. and Ibbs, C. W. (2002) Project management process maturity model (PM)2[J]. Journal of Management in Engineering, ASCE, 18(3).
  • 5Gabor Klimko.Knowledge management and maturity models: building common understanding [A]. Proceedings of the 2nd European Conference on Knowledge Management. [C]. Bled, Slovenia, 2001:269-278.
  • 6J.E. Strutt, J.V. Sharp, E. Terry, R. Miles. Capability maturity models for off shore organizational management [J].Environment International, 2006, (32): 1094-1105.
  • 7[美]项目管理协会著,卢有杰.王勇译.项目管理知识体系指南(第3版)(PMBOK+指南)[M].北京:电子工业出版社,2005.
  • 8Project Management Institute. An executive's guide to OPM3. PMI, Pennsylvania, USA, 2003.
  • 9[美]贝内特·P·利恩兹 凯瑟琳·P·雷.21世纪的项目管理(第3版)[M].北京:电子工业出版社,2003..
  • 10[美]美国项目管理学会(PMI).项目管理知识体系指南(PMBOK)[M],2000.

共引文献48

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部