摘要
LDAR变更管理是保障LDAR项目顺利、合规、持续开展的必要工作。总结了现场常见的5种密封点变更场景,并按照现场变更情况的记录及确认、变更任务的分配及现场变更操作、变更任务审核及最终确认3个模块,给出了LDAR变更管理的建议做法,明确了LDAR变更信息化管理的重要性,并对LDAR变更管理实施的频率提出建议。
Management of Change(MOC)is a necessary work to ensure the smooth,compliant and continuous development of LDAR program.in this paper,five component change circumstances on site were summarized,a recommended process of LDAR MOC work in recording,confirming,doing and checking was given,and the importance of MOC platform construction was expounded.Meanwhile,suggestions on MOC implementation frequency and charging mode were also provided.
作者
夏薇
刘峰
吴庆峰
Xia Wei;Liu Feng;Wu Qingfeng(Shanghai HaaenClean Environmental Engineering Co.,Ltd.,Shanghai,200443)
出处
《安全、健康和环境》
2022年第7期56-58,共3页
Safety Health & Environment
关键词
安全管理
密封点
泄漏
泄漏检测与修复
变更管理
safety management
component
leak detection
leak detection and repair
management of change