摘要
地质条件复杂是五沟煤矿显著的矿井特征,1010-1工作面更是明显受到多个断层的综合影响,通过开展实施“精准过断层施工方法技术研究与实践”,及时总结过断层施工方法和实践经验,并将久米纳矿用无机加固材料(新材料)引入到超前治理断层、加固断层中去,为安全精准过断层提供新方法,加快掘进进度,提高单进水平。
Complex geological conditions are the remarkable mine characteristics of Wugou Coal Mine,and 1010-1 working face is obviously affected by the comprehensive influence of many faults.Through the implementation of"Research and practice on Construction methods and techniques of accurate Fault Crossing",the construction methods and practical experience of faults have been summarized in time,and inorganic reinforcement materials(new materials)used in Jiumina Mine have been introduced into the advanced treatment and reinforcement of faults,which provides a new method for safe and accurate crossing faults.The progress of tunneling is accelerated and the level of single advance is improved.
出处
《科技创新与应用》
2022年第21期137-141,共5页
Technology Innovation and Application
关键词
快速掘进
一站到位
装备水平
rapid excavation
one stop in place
equipment level