简析大质量盖梁分节段预制安装施工与安全验算 被引量:1

Brief Analysis on Prefabrication, Installation, Construction and Safety Checking Calculation of Large-mass Bent Cap in Segments
下载PDF
导出
摘要 基于缩短工期、便于施工、降低交通影响、保护环境等目的,越来越多的城市高速公路或市政高架桥梁工程采用分节段安装大尺寸、大质量预制盖梁.当采用钢扁担联合螺纹钢筋固定工艺安装"浦星公路跨芦恒路节点改造新建工程"580 t盖梁P1时,不仅各项安全指标验算结果表明该工艺可靠,而且实施效果较佳,较计划工期提前.该工艺可行性较强,既是对目前湿接法工艺的补充和完善,也为同行业者提供一定的参考与借鉴. In order to shorten the construction period, facilitate the construction, reduce the traffic impact,protect the environment, and so on, the installation of large-size and large-mass prefabricated bent caps in segments are adopted in more and more urban expressway and municipal elevated bridge projects.Taking the 580-t bent cap P1 in Puxing Highway Crossing Luheng Road Node Reconstruction Project installed by the steel shoulder pole combined with thread reinforcement fixing technology as an example,the checking calculation results of various safety indexes shows that not only this technology is reliable,but also its implementation is good and is ahead of schedule. The technology has the strong feasibility,which is not only a supplement and improvement to the current wet joining process, but also a reference for the counterparts in this field.
作者 吴连盛 WU Liansheng
出处 《城市道桥与防洪》 2022年第6期159-162,共4页 Urban Roads Bridges & Flood Control
关键词 大尺寸 大质量 盖梁 芦恒路 扁担 安全验算 湿接 large size large mass bent cap Luheng Road shoulder pole safety checking calculation wet jointing
  • 相关文献

参考文献3

二级参考文献11

共引文献10

同被引文献11

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部