期刊文献+

适用于高桥隧占比高速铁路的综合接地方案研究 被引量:1

Study on Integrated Grounding Solution for High-speed Railway with High Proportion of Bridges and Tunnels
下载PDF
导出
摘要 对于桥隧占比高的高速铁路线路,为合理利用构筑物内的钢筋结构,减少维护工作量,降低投资,通过理解和分析现行防雷接地技术规范及相关通用图册,提出在隧道及部分桥梁地段,利用电缆槽内纵向接地钢筋取代贯通地线的综合接地方案,并对该方案的工程可实施性进行了研究与分析。 Based on the understanding and analysis of current technical specifications of lightning protection and grounding and relevant all-purpose book of drawings,an integrated grounding solution is proposed for high-speed railway with high proportion of bridge and tunnel,in which the longitudinal grounding reinforcement in the cable trench replaces the through ground wire in the tunnel and some bridge sections in order to make rational utiliztion of the reinforcement construct in the structure and reduce the maintenance workload and the cost.In the end,the feasibility of the project is studied and analyzed.
作者 朱明 Zhu Ming
出处 《铁道通信信号》 2022年第6期30-33,共4页 Railway Signalling & Communication
基金 中铁二院工程集团有限责任公司科研课题(KYY2019042(19-21))。
关键词 高速铁路 桥隧占比 综合接地 贯通地线 防雷接地 纵向接地钢筋 High-speed railway Proportion of bridge and tunnel Integrated grounding Through ground wire Lightning protection grounding Longitudinal grounding reinforcement
  • 相关文献

参考文献9

二级参考文献13

  • 1刘立峰,廖自力.高速铁路综合接地特殊工点技术方案[J].铁路技术创新,2010(5):48-51. 被引量:3
  • 2DL/T621-1997,交流电气装置的接地[S].北京:中国电力出版社,1998.
  • 3铁建设[2007]39号[R].铁路防雷、电磁兼容及接地工程技术暂行规定,2007.
  • 4冯金柱.电气化铁路基础知识[M].北京:中国铁道出版社,1995.
  • 5铁科院.温福铁路福建段动态检测报告[R].2009.
  • 6中国中铁二院工程集团有限责任公司.通号2009(9301)铁路综合接地系统通用参考图[S].北京:铁道部经济规划研究院,2009.
  • 7中华人民共和国铁道部.铁建设[2007]39号铁路防雷、电磁兼容、及接地工程技术暂行规定[S].北京:中国铁道出版社,2009.
  • 8中华人民共和国铁道部.TB10020-2009/J971-2009高速铁路设计规范(试行)[S].北京:中国铁道出版社,2010.
  • 9中华人民共和国铁道部.铁建设[2007]39号.铁路防雷、电磁兼容及接地工程技术暂行规定[S].2007.
  • 10中华人民共和国铁道部.铁集成[2006]220号.客专综合接地实施办法[S].2006.

共引文献11

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部