期刊文献+

震后G318泸定段唐房沟泥石流治理研究

Study on Debris Flow Cconrtol of Tangfang Gully in Luding Section of G318 After the Earthquake
下载PDF
导出
摘要 汶川“5.12”、芦山“4.20”地震后,对于泥石流地震破坏表现为同震破坏和间接破坏,间接破坏是其主要破坏形式,表现为激活、加剧和新生。通过对G318泸定段唐房沟泥石流地震破坏的研究、泥石流形成条件的分析、灾害历史和危害性的调查、运动特征的计算,提出设置“4座拦砂坝+防护堤、排导槽”的综合治理措施。 After the Wenchuan“5.12”and Lushan“4.20”earthquakes,the seismic damage of debris flow shows co seismic damage and indirect damage.Indirect damage is the main form of damage,which shows activation,intensification and rebirth.Based on the research on the earthquake damage of debris flow in Tangfang gully of G318 Luding section,the analysis of the formation conditions of debris flow,the investigation of disaster history and harmfulness,and the calculation of movement characteristics,the comprehensive control measures of“four sand retaining dams+protective dikes and drainage channels”are put forward.
作者 王宝亮 李辉良 Wang Baoliang;Li Huiliang(Southwest Geotechnical&Design Institute of China Nuclear Industry,Chengdu 610061,China;Tibet Southeast Construction Co.,Ltd.,Linzhi 860100,China)
出处 《科学技术创新》 2022年第20期105-108,共4页 Scientific and Technological Innovation
基金 核工业西南勘察设计研究院青年创新基金(2020CX002)“地质灾害防治与土木工程结构健康研究”。
关键词 震后 G318泸定段 唐房沟泥石流 灾害历史 综合治理 After the earthquake G318 Luding section Tangfang gully debris flow Disaster history Comprehensive control
  • 相关文献

参考文献10

二级参考文献147

共引文献446

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部