180min天窗一步到位更换接触网承力索和接触线施工工艺 被引量:3

Construction Process for One-step Replacement of OCS Catenary and Contact Wire During 180min Window
下载PDF
导出
摘要 随着我国铁路建设持续发展,既有电气化铁路接触网换线改造项目日益增多。为解决既有铁路接触网改造施工与日常运输之间的矛盾,提高接触网改造施工天窗利用率,以确保在运营线路安全、优质、高效地完成施工任务,并更好地适应灵活多变的施工要求,结合京原铁路工程实践,从施工组织方式和施工工艺等方面,提出相关改进优化措施。 With the continuous development of railway construction in China, there are more and more OCS line replacement and upgrade projects of existing electrified railways. In order to solve the contradiction between the OCS upgrade of the existing railway and daily transportation, improve the utilization rate of the construction window for the OCS upgrade to ensure that the construction tasks can be completed with safety, quality and efficiency in the operation line, and better adapt to the flexible construction requirements, in combination with the engineering practice of Beijing-Yuanping Railway, relevant improvement and innovation measures are put forward in terms of the construction organization mode and the adoption of new construction technology.
作者 卢炳杨 邓怀宏 LU Bingyang;DENG Huaihong(First Project Management Shijiazhuang Branch,The First Engineering Co Ltd of China Railway Electrification Bureau Group,Shijiazhuang Hebei 050000,China)
出处 《铁路技术创新》 2022年第2期25-29,共5页 Railway Technical Innovation
关键词 铁路接触网 换线改造 180min 施工天窗 施工工艺 railway OCS line replacement and upgrade 180min construction window construction process
  • 相关文献

参考文献8

二级参考文献9

共引文献9

同被引文献15

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部