摘要
实现“四网融合”对于构建高效、便捷的一体化轨道交通网络,全面提升运输服务品质,实现轨道交通高质量、健康可持续发展具有重要意义。本文以上海市域铁路嘉闵线为例,从网络融合层面,研究市域铁路与国铁、城市轨道交通系统衔接规划控制;从线路融合层面,探讨通道布局、站点规划、节点衔接等总体方案;从保障设施融合方面,对嘉闵线调度中心、车辆基地、信号控制设备、票务系统融合层面进行探讨。嘉闵线实现“四网融合”的方案设计能为市域铁路规划建设提供参考。
The realization of “quadri-networks integration” is of great significance for building an efficient and convenient integrated rail transit network,comprehensively improving the quality of transportation services,and realizing the high-quality,healthy and sustainable development of rail transit.Taking Jiaxing-Minzhou Railway of Shanghai regional railway as an example,this paper studies the planning and control of the connection between Shanghai regional railway,national railway and urban rail transit system from the perspective of network integration;from the perspective of line integration,the overall schemes such as channel layout,station planning and node connection are discussed;from the aspect of guaranteeing facilities integration,this paper discusses the integration of Jiaxing-Minzhou Railway dispatching center,vehicle base,signal control equipment and ticketing system.The scheme design of Jiaxing-Minzhou Railway in realizing “quadri-networks integration” can provide reference for the planning and construction of municipal railway.
作者
许兆俊
XU Zhaojun(China Railway Shanghai Design Institute Group Co.Ltd.,Shanghai 200070,China)
出处
《铁道建筑技术》
2022年第6期109-112,170,共5页
Railway Construction Technology
关键词
四网融合
市域铁路
嘉闵线
总体方案
quadri-networks integration
municipal railway
Jiaxing-Minzhou Railway
overall scheme