摘要
本文通过分析镇城底矿22212综采工作面回采时,由于断层影响出现的液压支架倒架现象,总结分析了造成综采工作面液压支架倒架的原因,同时根据22212综采工作面实际情况提出了控制液压支架倒架的技术,并成功地应用于该工作面,为过断层时综采工作面液压支架倒架的控制提供了借鉴。
By analyzing the phenomenon of hydraulic support falling due to the influence of fault in No.22212 Face of Zhenchengdi Mine,the causes of hydraulic support falling were summarized and analyzed.At the same time,according to the actual situation of No.22212 Face,the technology of controlling hydraulic support falling was put forward.This technology was successfully applied to this face,which provided a reference for the control of hydraulic support falling in fully mechanized mining face when passing through fault.
作者
闫志杰
Yan Zhijie(Zhenchengdi Mine,Xishan Coal Electricity,Taiyuan 030203,China)
出处
《煤炭与化工》
CAS
2022年第6期32-34,82,共4页
Coal and Chemical Industry
关键词
综采工作面
过断层
液压支架倒架原因
控制技术
fully mechanized mining face
cross fault
reasons for hydraulic support inversion
control technology