上跨既有线钢结构桥梁大吨位吊机精确吊装施工技术 被引量:2

Accurate Hoisting Construction Technology of Large-tonnage Cranes for Upper-span Existing Steel Structure Bridges
下载PDF
导出
摘要 结合工程案例,在桥位附近地面对钢梁进行整体拼装,采用抬吊一次将整跨钢梁吊装就位的施工技术,确保了梁体的吊装精度,减少了交通封闭时间。同时对该技术的工艺特点、工艺原理、关键要点、质量控制等内容进行了系统分析。 In view of this working condition,the steel beams were assembled as a whole on the ground near the bridge position,and then the whole span of steel beams was hoisted into place by lifting and hoisting once to ensure the hoisting accuracy of the beam body and reduce the traffic closure time.Combined with engineering cases,this paper systematically analyzed the construction process characteristics,process principles,key construction operation points,quality control of the technology.
作者 魏军 WEI Jun(Zhejiang Jiaotou Traffic Construction Management Co.,Ltd.,Hangzhou,Zhejiang,310000,China)
出处 《建材技术与应用》 2022年第4期66-69,共4页 Research and Application of Building Materials
关键词 钢桥梁 整体拼装 兜底夹具 精度控制 交通封闭 steel bridge overall assembly bottom clamp precision control traffic closed
  • 相关文献

参考文献1

共引文献2

同被引文献4

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部