摘要
重点介绍海口塔动臂塔所在核心筒内操作平台施工工艺,并从操作平台的搭设和施工原理两方面阐述其施工工艺,使异形狭窄空间内钢板剪力墙支模质量得到有效控制,可为类似工程提供参考。
This paper introduced the construction process of operation platform within core tube where luffing jib crane was installed in Haikou Tower project, on the aspects of installation and construction of the operation platform. The steel sheet shear wall formwork quality within speciallyshaped narrow space was effectively controlled, providing references for similar projects.
作者
梁锦明
赵纯
翟巍
杨玉涛
花京春
LIANG Jin-ming;ZHAO Chun;ZHAI Wei;YANG Yu-tao;HUA Jing-chun(Beijing Fourth Construction&Engineering Co.,Ltd.,100024,Beijing,China)
出处
《建筑技术》
2022年第7期906-908,共3页
Architecture Technology
关键词
操作平台
核心筒
动臂塔
异形狭窄
operation platform
core tube
luffing jib tower crane
specially-shaped and narrow