介绍了漠阳江双捷拦河闸重建工程的设计施工情况,研究了保留部分枢纽建筑物条件下的枢纽布置方案,结合旧闸险情分析对水闸消力池分区更优的布置方案,水景观水文化方面的设计优化。同时,通过实际工程建设,验证了工程在地基处理、水毁应急处理等方面的设计施工方案的合理性。总结了本工程在设计和施工过程中主要的工程设计施工要点,为类似在原址重建的平原水闸工程提供借鉴。
This paper describes the design and construction of reconstruction project of Shuangjie Sluice in Moyang River.It studies the new layout of hydroproject under the condition of retaining part of the buildings of the old hydroprojec,a better layout scheme for the zoning of the sluice stilling basin,combined with the danger analysis of the old sluice,and the design optimization in optimizing the waterscape and water viewing culture.Meanwhile,through the actual project construction,the rationality of the design and construction scheme of the project in foundation treatment and water damage emergency treatment is verified.This paper summarizes the main engineering design and construction points in the design and construction process of the project,so as to provide reference for similar plain sluice projects reconstructed in the original site.
作者
段自力
DUAN Zili(Guangdong Hydropower Planning & Design Institute Co.,Ltd., Guangzhou 510635, China)
出处
《广东水利水电》
2022年第7期33-36,共4页
Guangdong Water Resources and Hydropower
关键词
重建水闸
枢纽布置
消力池分区
地基处理
水毁应急处理
水景观设计
reconstruction of sluice gates
layout of hydroproject
stilling basin zoning
foundation treatment
emergency treatment of water damage