以广州荔湾区某新建商业项目为例,结合该项目的周边环境及工程地质条件进行基坑支护方案选型分析,确定了地下连续墙/灌注桩+三轴搅拌桩+一道内支撑的优选方案。施工过程中的监测数据反馈基坑及周边环境变形处于规范规定的范围内,且基坑止水效果良好,论证了该项目基坑支护方案的合理性。
Taking a new commercial project in Liwan District,Guangzhou as an example,considering the surroundings and engineering geological conditions,possible deep foundation pit supporting schemes are analyzed,and finally the scheme where a soldier pile wall or diaphragm wall is supported by a set of strut is adopt,with three-axis mixing piles being used as waterproof curtain.During the excavation process of the pit,deformation monitoring data shows that the deformation of the pit and its surroundings is well controlled within the scope of specifications,and the pit goes well on shortage of groundwater resources,thus demonstrating the rationality of the deep foundation pit supporting scheme.
作者
彭学忠
彭浩
王渊
梁永恒
黄俊光
PENG Xuezhong;PENG Hao;WANG Yuan;LIANG Yongheng;HUANG Junguang(Guangzhou Port Co., Ltd., Guangzhou 510100, China;Guangzhou Design Institute Group Co.,Ltd., Guangzhou 510620,China;Guangzhou Construction Co.,Ltd., Guangzhou 510000,China)
出处
《广东水利水电》
2022年第7期52-56,65,共6页
Guangdong Water Resources and Hydropower
基金
广东省住房和城乡建设厅科技计划项目(编号:2020-K5-144658)
广州市建筑集团有限公司科技计划项目(编号:2021-KJ006)
广州港集团有限公司技术研发项目(编号:20210150)。
关键词
基坑支护
地下连续墙
灌注桩
三轴搅拌桩
内支撑
变形监测
supporting scheme
diaphragm wall
soldier pile wall
three-axis mixing piles
strut
deformation monitoring