摘要 介绍巴基斯坦某输电线路工程勘测面临的安全、交通、气候等问题,分享在工程勘测过程中积累的专业技术应用经验、项目组织管理经验以及国外工程勘测应注重的事项。 This paper introduces the problems in a transmission line project in Pakistan such as safety situation,traffic,climate,etc,and it shares our experience in the application of professional technology accumulated in the process of engineering survey,project organization and management experience,as well as the matters that should be paid attention to in foreign engineering survey.
作者 高春林 李鹤峰 顾志强 Gao Chunlin;Li Hefeng;Gu Zhiqiang(State Nuclear Electric Power Planning Design&Research Institute Co.,Ltd.,Beijing 100095)
出处 《电力勘测设计》 2022年第7期53-56,共4页 Electric Power Survey & Design
关键词 输电线路 勘测经验 巴基斯坦 transmission line survey experience Pakistan
  • 相关文献

参考文献3

二级参考文献13

  • 1张文兵,王朔.RTK技术在高程测量中要点控制[J].地理空间信息,2007,5(3):102-103. 被引量:7
  • 2徐绍铨,张华海,杨志强,等.GPS测量原理及应用[M].武汉:武汉大学出版社,2007.
  • 3GB/T18314-2001城市测量规范.
  • 4孔祥元,郭际明,刘宗泉.大地测量学基础.武汉:武汉大学出版社,2002.
  • 5乔仰文,赵长胜,夏春林,等.GPS卫星定位原理及其在测绘中的应用.北京:教育科学出版社,2003.
  • 6李征航,黄劲松.GPS测量与数据处理[M].武汉:武汉大学出版社,2001.
  • 7GB/T18314-2001,全球定位系统(GPS)测量规范.
  • 8JTS 131-2012水运工程测量规范[S].北京:人民交通出版社,2012.
  • 9JTS258-2008水运工程测量质量检验标准[S].北京:人民交通出版社,2008.
  • 10臧秀玲,朱逊敏.中巴经济走廊的战略价值及面临的挑战[J].理论视野,2017,0(2):72-76. 被引量:13

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部