夹岩水利枢纽工程左岸边坡施工期变形分析 被引量:1

Deformation Analysis of Left Bedding Bank Slope of Jiayan Water Conservancy Project
下载PDF
导出
摘要 夹岩水利枢纽工程左岸泄洪洞洞室群布置区域为顺层边坡,其间发育有RJ_(1)~RJ_(5)软弱夹层和F_(5)、f_(15)、f_(17)等断层,在施工后边坡存在滑动破坏的风险。基于左岸边坡地质资料对施工期监测数据进行分析,并对边坡开挖和支护全过程进行数值模拟计算,阐明了边坡变形规律和控制因素,监测数据和数值模拟结果均表明施工期及开挖完成后边坡整体稳定,其开挖和支护设计是合理的。 The arrangement area of spillway cavern group on the left bank of Jiayan Water Conservancy Project is bedding rock slope,and there develops RJ_(1)-RJ_(5) weak interlayer and F_(5),f_(15),f_(17) and other faults.There is a risk of slope sliding after construction.Based on the engineering geological conditions of the left bank slope,the monitoring data during the construction period was analyzed and numerical simulation was carried out for the whole process of excavation and support of the slope to clarify the deformation law and control factors of the slope.The monitoring data and numerical simulation results show that the slope is stable as a whole during the construction period and after the excavation is completed,and its excavation and support design is reasonable.
作者 徐李达 李永芳 侯迪 蒙世仟 荣冠 XU Li-da;LI Yong-fang;HOU Di;MENG Shi-qian;RONG Guan(State Key Laboratory of Water Resources and Hydropower Engineering Science,Wuhan University,Wuhan 430072,China;Guizhou Survey&Design Research Institute for Water Resources and Hydropower Co.,Ltd.,Guiyang 550002,China;Guangxi Water Resources and Electric Power Survey and Design Institute,Nanning 530023,China)
出处 《水电能源科学》 北大核心 2022年第6期175-178,170,共5页 Water Resources and Power
基金 黔科合重大专项字[2017]3005-6号 桂科(AB18126046)。
关键词 夹岩水利枢纽 边坡工程 安全监测 数值模拟 Jiayan Water Conservancy Project slope engineering safety monitoring numerical simulation
  • 相关文献

参考文献5

二级参考文献37

共引文献217

同被引文献19

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部