摘要 市政工程施工环境复杂,石方开挖风险系数相对较高,同时与清单计价相比,定额计价中采取不同的施工方式也对项目成本及效益有更大的影响。在施工中选择合理的施工方式既确保施工安全,又可在不影响项目的施工成本和进度前提下,最大化施工方的利益。以贵州双龙航空港经济区二堡路道路建设工程为例,分析复杂环境下的市政定额工程路基开挖方式如何选择,才能在保证施工安全及进度的前提下,最大化施工方的利益,包括分包商。 The construction environment of municipal engineering is complicated and the risk factor of rock excavation is relatively high.At the same time,compared with list pricing,different construction methods in quota pricing also have a greater impact on project cost and benefit.Choosing a reasonable construction method in construction not only ensures construction safety,but also maximizes the benefits of the constructor without affecting the construction cost and schedule of the project.Taking Erbao Road Construction Project as an example,this paper analyses how to choose the excavation method of subgrade for municipal quota project in complex environment so as to maximize the benefit of the constructor on the premise of ensuring construction safety and progress.
作者 张峻宾 ZHANG Jun-bin(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处 《云南水力发电》 2022年第7期141-143,共3页 Yunnan Water Power
关键词 复杂环境 市政工程 定额 路基开挖方式 complex environment municipal engineering quota excavation method of subgrade
  • 相关文献

参考文献2

二级参考文献10

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部