期刊文献+

水利工程施工国际项目收尾控制管理措施 被引量:1

Control and Management Measures for Ending of International Project of Hydraulic Engineering Construction
下载PDF
导出
摘要 建设工程项目收尾阶段的管理是整个企业项目风险管理周期中一个非常重要的环节,主要通过对水利工程施工国际项目收尾阶段发展存在的问题进行研究分析总结后,从项目资料管理、项目收尾策划编制和实施、收尾人员薪酬激励和明确债权回收责任人4个方面提出相应的国际项目收尾管理制度措施。 The management of construction project closing stage is a very important link in the whole enterprise project risk management cycle.This paper studies and analyses the problems existing in the development of international project closing stage of hydraulic engineering construction.This paper puts forward the measures of international project closing management system from four aspects:project data management,preparation and implementation of project closing plan,salary incentive paid by closing staff and clarifying the responsible person for credit recovery.
作者 杨坤 王玉祥 YANG Kun;WANG Yu-xiang(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处 《云南水力发电》 2022年第7期245-247,共3页 Yunnan Water Power
关键词 工程施工 国际项目 收尾控制 管理措施 engineering construction international project ending control management measure
  • 相关文献

参考文献7

二级参考文献9

共引文献44

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部