叠合预制预应力双T板的连接方法比较

Comparison of Connection Methods of Laminated Precast Prestressed Double T-shaped Plates
下载PDF
导出
摘要 结合工程实际,对双T板的几种主要节点连接方式和施工方法进行了梳理和总结。通过对双T板的反拱、吊装和安装就位等施工工况进行有限元计算分析,为施工提供了建议,以确保施工的安全,并可为类似工程参考。 Combined with the engineering practice,several main joint connection modes and construction methods of double T-shaped plate are summarized.Through the finite element calculation and analysis of the construction conditions such as reverse arch,hoisting and installation in place of double-T-shaped plate,some suggestions are provided for the construction to ensure the safety of construction,and can be used as a reference for similar projects.
作者 杨永宁 时春霞 潘峰 YANG Yongning;SHI Chunxia;PAN Feng(Shanghai Construction No.5(Group)Co.,Ltd.,Shanghai 200063,China)
出处 《建筑施工》 2022年第6期1191-1193,共3页 Building Construction
关键词 预制构件 预应力双T板 有限元计算分析 节点连接 precast component prestressed double T-shaped plate finite element calculation and analysis node connection
  • 相关文献

参考文献6

二级参考文献14

共引文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部