摘要
从翻滑模板系统组成出发,通过数值模拟及分析计算,确定其在混凝土浇筑过程中的受力及变形情况。研究结果表明,利用翻滑结合的方法进行空心薄壁高墩施工可保证施工的垂直度,同时具有较高的效率及可靠性。
Starting from the composition of the overturning formwork system,this paper determines its stress and deformation in the process of concrete pouring through numerical simulation and analysis and calculation.The research results show that the construction of hollow thinwalled high pier by the combination of overturning and sliding can ensure the verticality of the construction,and has high efficiency and reliability.
作者
李钰
倪宇杰
LI Yu;NI Yujie(China Communications Construction General Contracting and Operation Branch,Beijing 100032 China;School of Transportation and Civil Engineering Nantong University,Jiangsu Nantong 226019 China)
关键词
桥梁施工
翻滑结合
荷载
施工工艺
bridge construction
overturning sliding combination
load
construction technology