期刊文献+

厚大矿体采空区充填工艺优化研究 被引量:1

Study on Optimization of Filling Process in Mined-out Area of Thick and Large Orebody
下载PDF
导出
摘要 随着充填采矿法在厚大矿体开采中推广应用,提高充填体的质量成为采矿工艺一个重要环节。本文分别从充填料浆浓度控制、采场充填设施设置、胶凝材料选取等方面优化充填工艺,提出选择合适的充填挡墙、改善充填体脱水、采用低水化热高强度的充填胶凝材料等技术路线,以提高厚大充填体质量。 With the popularization and application of backfill mining method in thick and large ore body mining, improving the quality of filling body has become an important link in mining process. In this paper, the filling process is optimized from the aspects of concentration control of filling slurry, setting of filling facilities in stope, selection of binding materials, etc. The technical routes such as selecting appropriate barricade, improving dehydration of fill mass, and adopting filling binding materials with low hydration heat and high strength are put forward to improve the quality of thick and large filling mass.
作者 贺茂坤 吴世剑 温震江 HE Maokun;WU Shijian;WEN Zhenjiang
出处 《中国矿山工程》 2022年第3期54-57,共4页 China Mine Engineering
基金 国家十三五重点研发计划课题2019YFC0605300资助项目 科技部创新方法专项“深部金属矿山资源开发多创新方法集成应用研究与示范”(项目号2019IM050300)。
关键词 厚大充填体 充填工艺 充填质量 胶凝材料 thick and large filling mass filling process filling quality binding material
  • 相关文献

参考文献4

二级参考文献22

共引文献53

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部