期刊文献+

Estimation of wind erosion from construction of a railway in arid Northwest China

原文传递
导出
摘要 A state-of-the-art wind erosion simulation model,the Wind Erosion Prediction System and the United States Environmental Protection Agency's AP 42 emission factors formula,were combined together to evaluate wind-blown dust emissions from various construction units from a railway construction project in the dry Gobi land in Northwest China.The influence of the climatic factors:temperature,precipitation,wind speed and direction,soil condition,protective measures,and construction disturbance were taken into account.Driven by daily and sub-daily climate data and using specific detailed management fles,the process-based WEPS model was able to express the beginning,active,and ending phases of construction,as well as the degree of disturbance for the entire scope of a construction project.The Lanzhou-Xinjiang High-speed Railway was selected as a representative study because of the diversities of different cli-mates,soil,and working schedule conditions that could be analyzed.Wind erosion from different working units included the building of roadbeds,bridges,plants,temporary houses,earth spoil and barrow pit areas,and vehicle transportation were calculated.The total wind erosion emissions,7406 t,for the first construction area of section LXS-15 with a 14.877 km length was obtained for quantitative analysis.The method used is applicable for evaluating wind erosion from other complex surface dis-turbance projects.
出处 《International Soil and Water Conservation Research》 SCIE CSCD 2017年第2期102-108,共7页 国际水土保持研究(英文)
基金 supported by the National Science Foundation of China(41501008),the Youth Innovation Promotion Association(2016373)and the“Light of West China”Program of the Chinese Academy of Sciences.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部