摘要
根据CPR1000堆型核电厂电加热器设计选型思路对DVC电加热器的设计功率、设计参数、相对湿度等进行了计算分析及对比验证,确认了DVC新风净化系统试验过程中引发电加热器故障的主要原因,采用拆除电加热管的方法解决了电加热器功率过高的问题,并在实际核电厂工程进行了应用,取得了良好效果。
According to the design and type selection idea of electric heaters in CPR1000 reactor type nuclear power plants, the design power, design parameters, relative humidity, etc. of DVC electric heater are calculated, analysed, compared and verified, and the main cause of power heater failure during the test of DVC outdoor air purification systems is confirmed. The problem of excessive power of electric heaters is solved by removing the electric heating pipe, which has been applied in the actual nuclear power plant project and achieved good results.
作者
张文君
张立德
黄星
Zhang Wenjun;Zhang Lide;Huang Xing(China Nuclear Power Technology Research Institute Co.,Ltd.,Shenzhen)
出处
《暖通空调》
2022年第8期92-95,共4页
Heating Ventilating & Air Conditioning
关键词
核电厂
DVC电加热器
新风净化系统
设计功率
设计参数
相对湿度
改进措施
nuclear power plant
DVC electric heater
outdoor air purification system
design power
design parameter
relative humidity
improvement measure