海洋石油201船新旧首节托管架对比

Comparison on New and Old Hitch Section Stinger of HYSY201
下载PDF
导出
摘要 海洋石油201船的首节托管架在长期服役过程中发生变形和损坏,中国海洋石油工程总公司(COOEC)新建首节托管架。新首节托管架结构设计更简单,构造更合理,没有复杂节点,便于加工设计。对实际铺管阶段原首节托管架出现的关键轴节点变形原因进行分析,对新旧首节托管架的结构形式、整体结构强度进行对比。分析结果表明:改造后新托管架的性能得到优化,提升海洋石油201船的整体铺设能力。 As the original hitch section stinger of HYSY201 is deformed and damaged during the long-term service,China National Offshore Oil Engineering Corporation(COOEC) decides to build a new one.The structure design of the new one is simpler,more reasonable in construction,without complex nodes and convenient for machining design.The reasons for the deformation of the key axis nodes of the original hitch section in the actual pipe-laying stage are analyzed.The structural form and overall structural strength of the new and original hitch section stingers are compared.The analysis results show that the performance of the new stinger is optimized,and the overall laying capacity of HYSY201 is improved.
作者 倪明晨 聂霞 刘克建 崔宗伟 高堂钧 NI Mingchen;NIE Xia;LIU Kejian;CUI Zongwei;GAO Tangjun(COTEC Offshore Engineering Services,Beijing 102209,China;Offshore Oil Engineering Co.,Ltd.,Tianjin 300452,China)
出处 《中国海洋平台》 2022年第3期76-81,共6页 China offshore Platform
关键词 海洋石油201 托管架 优化 改造 HYSY201 stinger optimization upgrade
  • 相关文献

参考文献4

二级参考文献14

  • 1William L Leffler, Richard Pattarozzi, Gordon Sterling. Deepwater Petroleum Exploration & Production[R]. USA, PennWell Corporation, 2003.
  • 2Yong Bai, Qiang Bai. Subsea Pipelines and Risers[R]. Great Britain, Elsevier Ltd, 2005.
  • 3Ben C Gerwick Jr. Construction of Marine and Offshore Structures[M]. USA, CRC Press, 2007.
  • 4sChristopher West, Stephen Armstrong, Damon MeMillan, et al. S-lay installation of riser fairings for the independence hub[C]//Proceedings of the International Conference on Offshore Mech~ics and Arctic Engineering. 2007(1):515-525.
  • 5Heedo D Yun, Ralf R Peek, Paul R Paslay, et al. Loading history effects for deep-water S-lay of pipelines[J]. Journal of Offshotve Mechanics and Arctic Engineering, 2004, 126(2): 156-163.
  • 6Massimo Pulici, Marian Trifon, Andrei Dumitrescu. Deep water salines installation by using the J-lay method-The blue stream experience[ C] //Proceedings of the International Offshore and Polar Engineering Conference, ISOPE. 2003:585-590.
  • 7Dick Wolbers, Rob Hovinga. Installation of deepwater pipelines with sled assemblies using the new J-lay system of the DCV balder[J]. Journal of Offshore Technology, 2003, 11 (3) : 46-57.
  • 8T A Netto, A Botto, M I Lourenco, et all. On the feasibility of installing SCR's by the reel-lay method[ C ]//' Proceedings of the 12th In- ternational Congress of the International Maritime Association of the Mediterranean. 2005(2):1447-1454.
  • 9Alastair Tawns. Reel-laying of rigid pipelines[J]. Materials Performance, 2004, 43( 10): 24-26.
  • 10llson P Pasqualino, Segen F Estefen, Silvia L Suva. The effect of the reeling laying method on the collapse pressure of steel pipes for deepwater[C]//Proceedings of the International Conference on Offshore Mechanics and Arctic Engineering, ASME. 2004(3):247- 254.

共引文献105

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部