摘要
顶管施工技术相比于其他施工技术,最主要的特点是可以缩小施工范围,减小施工对周围环境以及人民日常生活的影响。顶管施工是一项施工复杂的工程,由于其本身特性,导致在进行顶管部分工作时,所需的施工周期较长,而且顶管施工对于施工要求相对严格。如何在工程建设中巧妙地应用顶管技术,是目前市政管线工作的重点之一。
Compared with other construction technologies,the main feature of pipe jacking construction technology is that it can reduce the construction scope and reduce the impact of construction on the surrounding environment and people’s daily life.Pipe jacking construction is a complex construction project.Due to its own characteristics,the required construction period is long when the pipe jacking part is performed,and the pipe jacking construction has relatively strict construction requirements.How to skillfully apply the pipe jacking technology in engineering construction is one of the key points of the current municipal pipeline work.
作者
董宏杰
程建霞
Dong Hong-jie;Cheng Jian-xia(Guangrao County Comprehensive Administrative Law Enforcement Bureau,Dongying 257300,Shandong Province,China;Guangrao County Housing and Urban-Rural Development Bureau,Dongying 257300,Shandong Province,China)
出处
《建筑与装饰》
2022年第15期142-144,共3页
Construction & Decoration
关键词
市政工程
顶管施工技术
质量控制
municipal engineering
pipe jacking construction technology
quality control