摘要
本文结合实际思考,首先简要分析了燕罗街道电缆沟建设项目的基本概况;其次对燕罗街道电缆沟建设项目协调与施工部署环节的施工环境、水文情况、气象条件及工程地质条件进行阐述;最后对此项目建设期间的施工总体部署进行规划。希望通过电缆沟建设项目协调与施工部署来发挥出项目部的各项职能,节省工程运行期间的劳动力,以提高工程的整体效率。
Based on practical thinking,this article first briefly analyzes the basic situation of the cable trench construction project in Yanluo Street;secondly,it expounds the construction environment,hydrological conditions,meteorological conditions and engineering geological conditions in the coordination and construction deployment of the cable trench construction project in Yanluo Street;finally,it plans the overall construction deployment during the project construction period.It is hoped that various functions of the project department can be exerted through the coordination and construction deployment of the cable trench construction project,saving labor during the operation of the project,and improving the overall efficiency of the project.
作者
顾仲稷
Gu Zhong-ji(Shenzhen Geotechnical Investigation&Surveying Institute(Group)Co.,Ltd.,Shenzhen 518028,Guangdong Province,China)
出处
《建筑与装饰》
2022年第15期151-153,156,共4页
Construction & Decoration
关键词
电缆沟
建设项目
施工部署
协调
科学编制
cable trench
construction project
construction deployment
coordination
scientific preparation