摘要
大型综合医院机电系统管线复杂,BIM技术的快速发展为医院机电系统的管道布置带来了新的方法。文章试图从数据分析的角度进行医院建筑净高控制研究,主要包括确定BIM技术结合数据分析的实施路径;简要分析影响医院走道的空间条件。通过BIM模型进行管线相关空间数据提取,分析数据得出设计经验值,为净高预测和控制提供了一种新的方法。
The pipeline of MEP system in large general hospital is complex.The rapid development of BIM Technology has brought a new method for the pipeline arrangement of electromechanical system in hospital.This study attempts to research the clear height control of hospital buildings from the perspective of data analysis,mainly including determining the implementation path of BIM Technology combined with data analysis;the spatial conditions affecting the hospital walkway are briefly analyzed.The BIM model is used to extract the spatial data related to the pipeline,and the design experience value is obtained by analyzing the data,which provides a new method for net height prediction and control.
出处
《建筑与文化》
2022年第8期48-51,共4页
Architecture & Culture
关键词
医院建筑
机电系统
管线综合
BIM
净高控制
hospital building
MEP systems
pipeline integration
BIM
clear height control