期刊文献+

大型枢纽车站既有线插铺42号有砟道岔的施工技术 被引量:1

CONSTRUCTION TECHNOLOGY OF INSERTING NO.42 BALLAST TURNOUT ON EXISTING LINE OF LARGE HUB STATION(STATION)
下载PDF
导出
摘要 某大型枢纽车站既有线站该施工为例,分析了对大型枢纽车站插入42号道岔的施工难点,后对施工过程中所使用的施工技术进行了探讨,通过对站改施工中的难点、要点进行研究,成功完成站改工程,相关研究为类似工程具有一定的借鉴参考价值。 Taking the construction of an existing line station of a large hub station as an example,this paper analyzes the construction difficulties of inserting No.42 turnout into the large hub station,and then discusses the construction technology used in the construction process.Through the research on the difficulties and key points in the station reconstruction,the station reconstruction project is successfully completed.The relevant research has certain reference value for similar projects.
作者 王建军 温艳才 樊鹏武 Wang Jian-jun;Wen Yan-cai;Fan Peng-wu
出处 《建筑技术开发》 2022年第14期37-42,共6页 Building Technology Development
关键词 客运专线 插入42号道岔 难点 要点 passenger dedicated line insert turnout 42 difficulty main points
  • 相关文献

参考文献2

二级参考文献5

共引文献3

同被引文献11

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部