榆树坡矿5号煤首采面底板突水危险性分析及防治技术 被引量:2

Analysis and prevention technology of floor water outburst risk in No.5 coal first mining face of Yushupo Mine
下载PDF
导出
摘要 榆树坡煤矿5号煤层首采面5105工作面为带压开采工作面,且工作面内部发育多条断层,在回采期间发生底板奥灰突水事故的可能性较大。因此,为了实现该面安全带压开采,在回采前,采用综合物探方法探查构造发育区及富水异常区,并采用底板超前预注浆工艺加固隔水层,改造含水层。实践表明,通过底板注浆治理工艺,该面实现了安全带压开采,取得了良好的经济效益,为矿井及周边带压开采矿井提供经验借鉴。 The No.5105 face, which is the first mining face of No. 5 coal seam in Yushupo Mine, is a mining face under pressure, and there are many faults in the working face. The possibility of water outburst from Ordovician limestone in the floor during mining is large. Therefore, in order to achieve the safe mining under pressure of this face, before the mining of this face, the comprehensive geophysical exploration method was used to explore the structural development area and the water abundance anomaly area, and the floor advanced pre-grouting technology was used to strengthen the aquifuge and transform the aquifer. The practice showed that through the floor grouting control process, the face achieved safe mining under pressure, and obtained good economic benefits, which provided experience for the mine and surrounding mines under pressure.
作者 冯巍 Feng Wei(Huayang New Material Technology Group Co.,Ltd.,Yangquan 045000,China)
出处 《煤炭与化工》 CAS 2022年第7期82-85,88,共5页 Coal and Chemical Industry
关键词 带压开采 综合物探技术 超前预注浆 水害防治 mining under pressure comprehensive geophysical exploration technology advance pre-grouting water damage prevention and control
  • 相关文献

参考文献6

二级参考文献54

共引文献264

同被引文献11

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部