针对河道治理类工程多工序、多交叉、时间紧、任务重等特点,基于BIM、计算机应用、无线网络通讯、GIS(地理信息系统)、视频监控技术建立统一管理系统,可以对施工进行全程监控,使施工作业问题能够及早发现、快速解决,形成长效管理机制,使河道治理工程管理更科学、合理、规范。
Regarding the characteristics of multi-process,multi-intersection,tight time and heavy tasks in river regulation projects,we establish a unified management system which is based on the BIM technology,computer technology,wireless network technology,GIS geographic information technology,and video surveillance technology,by which we can realize the whole-process monitoring and control and enable construction operation problems to be identified early and resolved quickly,forming a long-term management mechanism and making the management of river regulation projects more scientific,rational and standardized.