摘要
通过分析高坝大库勘察各阶段任务以及相关专业对地质成果的需求,结合行业内技术可行、经济合理的数字化手段,提出各勘察阶段数字化应用重点,用以提高勘察精度及效率,推动勘察过程中数字化应用的正向设计,通过循序渐进避免重复工作。高坝大库建设周期长,数字化技术相对于其他水利工程可用性高,可为类似工程提供参考。
By analyzing the tasks of each stage of high-dam and large-scale reservoir survey and the needs of related majors for geological results, combined with technically feasible, economical and reasonable digital means in the industry, put forward the key points of digital application in each survey stage, improve survey accuracy and efficiency, and promote the exploration process. Forward design of digital applications, step by step to avoid duplication of work. The construction period of high dams and reservoirs is long, and the availability of digital technology is high compared to other water conservancy projects, which can provide reference for similar projects.
作者
陈建辉
王晨浩
郭抒燕
Chen Jianhui;Wang Chenhao;Guo Shuyan
出处
《中国水利》
2022年第14期62-64,共3页
China Water Resources
关键词
高坝大库
数字化技术
正向设计
地质三维
high-dam and large-scale reservoir
digital technology
positive design
geological 3D