摘要 110 kV变电站低压侧一回出线发生三相短路故障,线路保护和重合闸依据整定运行规则正确可靠动作,但在重合闸重合于永久性故障且线路保护正确动作切除故障的情况下,主变差动保护误动,造成上网功率减小。 Three-phase short-circuit fault occurred in the low-voltage side primary line of 110 kV substation,and the line protection and reclosing acted correctly and reliably according to the setting operation rules.However,when reclosing was coincident with permanent fault and the line protection acted correctly to remove the fault,the main transformer differential protection misoperated,resulting in reduced online power.
作者 周文勇 程国萍 ZHOU Wenyong;CHENG Guoping(Wenshan Malipo Power Supply Bureau of Yunnan Power Grid Co.,Ltd,Yunnan Wenshan 663000,China)
出处 《电工材料》 CAS 2022年第4期67-69,共3页 Electrical Engineering Materials
关键词 变电站 瞬时电流速断 重合闸 CT饱和 保护误动 substation instantaneous current quick break reclosing CT saturation protection misoperation
  • 相关文献

参考文献1

二级参考文献21

共引文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部