摘要
泥水平衡顶管施工是机械化顶管施工的主要方法之一,属于机械化、长距离顶进施工技术,安全性能及机械化程度较高。文中主要介绍了泥水平衡顶管施工技术在厦门市前埔污水处理厂北线污水系统二期工程(B标段)的实践应用,并分析了顶管施工常见问题的处理措施。
The mud-water balance pipe jacking construction is one of the main methods of mechanized pipe jacking construction. It belongs to the mechanized and long-distance jacking construction technology with high safety performance and degree of mechanization. This paper mainly introduces the practical application of the mud-water balance pipe jacking construction technology in the second phase of the North Line Sewage System Project of Xiamen Qianpu Sewage Treatment Plant(Part B), and analyzes the treatment measures for common problems in pipe jacking construction.
作者
朱凯华
Zhu Kaihua(China Construction Far South Group Co.Ltd.,Xiamen,Fujian 361000)
出处
《江西建材》
2022年第6期313-315,共3页
Jiangxi Building Materials
关键词
泥水平衡
顶管施工技术
市政管道
Mud-water balance
Pipe jacking construction technology
Municipal pipeline