杭州博奥隧道大型泥水盾构接收设计及施工关键技术 被引量:2

Key Technology of Receiving Design and Construction of Large-scale Slurry Shield in Hangzhou Boao Tunnel
下载PDF
导出
摘要 盾构的始发与接收是大直径盾构隧道工程施工中的关键工序,具有施工难度大、风险高的特点,如何安全顺利地完成盾构接收,一直是盾构法隧道工程亟需解决的难题之一。文中以杭州博奥隧道工程为例,对在粉砂土层地质条件下大型泥水平衡盾构的接收方案及施工控制关键技术进行了分析,为今后同类型地质条件下大型泥水盾构接收提供参考。 The starting and receiving of shields are the key processes in the construction of large-diameter shield tunnels, which are characterized by high construction difficulty and high risks. How to safely and smoothly complete the receiving of shields has always been an urgent problem for shield tunneling projects. one of the problems. Taking Hangzhou Boao Tunnel Project as an example, this paper analyzes the receiving scheme and key construction control technology of large-scale mud-water balance shield under the geological conditions of silt soil layer, and provides a reference for the reception of large-scale mud-water shield under the same type of geological conditions in the future.
作者 朱益强 Zhu Yiqiang(Hangzhou Qianjiang New Town Construction Management Committee,Hangzhou,Zhejiang 310000)
出处 《江西建材》 2022年第6期320-322,共3页 Jiangxi Building Materials
关键词 过江隧道 大盾构接收 接收方案 施工控制 River crossing tunnel Large shield receiving Receiving scheme Construction control
  • 相关文献

参考文献4

二级参考文献17

共引文献38

同被引文献18

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部