亦庄有轨电车T1线热滑试验方案设计与实践

Thermal Sliding Test Scheme of Yizhuang Tram Line T1Design and Practice
下载PDF
导出
摘要 在借鉴地铁热滑工程经验的基础上,充分结合亦庄有轨电车T1线工程的设计与运行特点,对热滑试验方案进行了详细设计与优化,确立了热滑试验范围、前提条件、职责分工、行车线路,着重对试验前检查、路口安保、应急救援工作进行了阐述,指导热滑试验组织管理,并针对试验实施过程中发现的质量缺陷与安全隐患提出整改措施,同时进一步验证热滑方案的科学性、准确性、安全性,为相关单位开展热滑试验提供借鉴与参考。 Based on the experience of subway hot slide project and ful y combined with the design and operation characteristics of Yizhuang tram line T1 project, the hot slide test scheme is designed and optimized in detail,and the hot slide test scope, preconditions, division of responsibilities and driving lines are established. The inspection before the test, intersection security and emergency rescue are described to guide the organization and management of hot slide test, It also puts forward rectification measures for the quality defects and potential safety hazards found in the implementation of the test, and further verifies the scientificity, accuracy and safety of the hot sliding scheme, so as to provide reference and reference for relevant units to carry out the hot sliding test.
作者 王子豪 王顺廷 Wang Zi-hao;Wang Shun-ting(Beijing Yizhuang bus tram Co.,Ltd.,Beijing 100176)
出处 《电子质量》 2022年第7期134-137,142,共5页 Electronics Quality
关键词 有轨电车 热滑试验 方案设计 组织管理 Tram hot sliding test scheme design organization and management
  • 相关文献

参考文献2

二级参考文献8

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部