摘要
龙子湖东站建设通过叠合结构与局部整体现浇相结合、叠合结构预制板与局部盘扣支架代替传统临时模板,合理使用了标准化预制构件和满堂支架等施工技术,减小了在恶劣低温天气下施工的时间压力,解决了施工地面积有限的问题,为其他工程建设提供一定参考。
Longzi Lake East Station construction by composite structure combined with the local overall cast-in-place slab and composite structure and local dish buckle stents instead of traditional template temporarily,the rational use of the standard prefabricated and full framing construction techniques,such as reduced under low temperature weather construction time pressure,solves the problems of the work area is finite,provide certain reference for other engineering construction.
作者
张伟
ZHANG Wei(China Railway 16th Bureau Group Beijing Metro Engineering Construction Co.,Ltd.,Beijing 100000,China)
出处
《黑龙江交通科技》
2022年第7期171-173,共3页
Communications Science and Technology Heilongjiang
关键词
地铁站工程
叠合装配式
施工技术
subway station project
stacked assembly type
construction technology