摘要
从装配式建筑的发展与铝模爬架一体化施工技术出发,探讨了施工中的空间碰撞、施工风险性、铝模接缝处理等施工技术难点。通过相关计算,得出了施工设计阶段的优化措施、强化铝模接缝处的连接方式、加强墙体刚度等结论。
Based on the development of prefabricated buildings and the integrated construction technology of aluminum film climbing frame, the paper discusses the construction technical difficulties such as space collision, construction risk and aluminum film joint treatment. Through the relevant calculation, the optimization measures in the construction design stage, strengthening the connection mode of aluminum film joints, strengthening the wall stiffness and other conclusions are drawn.
作者
李江彦
陈伟
LI Jiang-yan;CHEN Wei(China Construction Second Engineering Bureau Ltd.,Beijing 100160,China)
出处
《工程建设与设计》
2022年第14期111-113,共3页
Construction & Design for Engineering
基金
中国建筑第二工程局有限公司科技资助计划(91110000100024296DHB207002)。
关键词
装配式建筑
铝模爬架
一体化施工
技术优化
prefabricated buildings
aluminum climbing frame
integration construction technology
technical optimization