西安市渼陂湖工程建筑垃圾堆山沉降及稳定性分析

Settlement and Stability Analysis of Construction Waste Mound of Meibei Lake Project In Xi'an City
下载PDF
导出
摘要 西安市渼陂湖项目景区为合理利用建筑垃圾资源,开展了建筑垃圾造山建设。以此为例,通过对渼陂湖项目景区垃圾填料的物理力学性能试验,构建景山堆体三维计算模型,并对其固结沉降及抗滑稳定性进行分析。得到在不同工况下的沉降量范围和位移变化规律、最小安全系数,并对常见问题处理提出合理化建议,为类似项目提供指导。 In order to make rational use of construction waste resources,Xi'an Meibei Lake project scenic spot has carried out the construction of mountain using building waste.Taking this as an example,a three-dimensional calculation model of Jingshan mound is built through the physical and mechanical properties test of garbage filling in Meibei Lake project scenic spot,and its consolidation settlement and anti-sliding stability are analyzed.The settlement range,displacement variation law and minimum safety factor under different working conditions are obtained,and reasonable suggestions are put forward for the treatment of common problems,which provides guidance for similar projects.
作者 闫亚团 李盼 许广兴 王腾 续育飞 郭雄斌 顾玮晔 郭昆 YAN Yatuan;LI Pan;XU Guangxing;WANG Teng;XU Yufei;GUO Xiongbin;GU Weiye;GUO Kun(China Construction Third Bureau Group Co.,Ltd.,Xi'an,Shaanxi 710065,China)
出处 《建筑施工》 2022年第7期1701-1703,1708,共4页 Building Construction
基金 陕西省住房和城市建设厅科技计划项目课题(2021-K06)。
关键词 景区假山 建筑垃圾 固结沉降 抗滑稳定性 scenic rockery construction waste consolidation settlement anti-sliding stability
  • 相关文献

参考文献7

二级参考文献32

  • 1沈珠江.新弹塑性模型在软土地基固结分析中的应用[J].水利水运科学研究,1993(1):55-63. 被引量:9
  • 2程展林,丁红顺.论堆石料力学试验中的不确定性[J].岩土工程学报,2005,27(10):1222-1225. 被引量:25
  • 3[5]叶书麟,韩杰,叶观宝.地基处理与托换技术[M].北京:中国建筑工业出版社,1995.
  • 4[2]洛根(Logan,D.L) (美)著,伍义生等译.有限元方法基础教程[M].北京: 电子工业出版社,2003.8.
  • 5[3]莫维尼(Moaveni,S) (美)著,欧阳宇等译.有限元分析: ANSYS理论与应用[M].北京: 电子工业出版社,2003.6.
  • 6[4]天津市环境地质研究所,天津大学,天津市地质工程勘察院.天津市建筑垃圾堆埋场堆山造境工程勘察评价报告[R].天津: 天津大学,2003.6.
  • 7[7]Tavenus F, et al. Lateral displacements in clay foundations under embankments[J]. Can. Geotech. J, 1979,16(3):532 -550.
  • 8[8]Duncan J. D. State of the Art:Limit Equilibrium and Finite-Element Analysis of Slopes[J].1996,122:557-592.
  • 9[9]Ladd C. C Stability Evaluation during Staged Construction[J]. Proc. ASCE,Journal of Geotechnical Engineering Division, 1991,117:540-615.
  • 10[10]Leroueil Construction pore pressure in clay foundation under embankment[J]. Can. Geotech. J 1978,15(1):66-82.

共引文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部